Project requirements
For antenna and base-station connections, specify the exact interfaces, feeder cable, operating band and installation space. Compare 4.3-10, 7/16 DIN and N options against the actual equipment drawing.
Inspection and acceptance
For outdoor installations, agree sealing, cable support and the required PIM test conditions. Connector type alone does not establish an assembly’s PIM result or waterproof performance.
