Project requirements
Start a custom connector review with the mating drawing, mounting envelope and electrical requirements. Mark the dimensions that cannot change and any acceptable alternatives.
Inspection and acceptance
Agree drawing revision, materials, inspection requirements and sample approval criteria before discussing production quantities. An equivalent-looking part still requires interface and performance verification.
