Project requirements
Before an order, confirm the controlled drawing, material grades, finish and critical dimensions. Discuss machining, assembly and inspection requirements for the specific part.
Inspection and acceptance
Request the records needed for your acceptance process, such as dimensional results, material identification and batch traceability. Availability of documents and processes must be agreed for the order.
