Project requirements
Define the parameters to measure: continuity, insulation, dimensions, VSWR or return loss, and insertion loss as applicable. Specify the operating band and acceptance limits.
Inspection and acceptance
Agree calibration, reference planes, fixtures and environmental conditions. Reports should identify the tested model, sample or batch and the agreed method; request a sample report during technical review.
